The Pool deck is now poured as we have had a break in the weather. This photo is showing the installation of the final smoothing coat of cement that is needed before the color coat is applied.
Scaffolding around the four down river units is in place to finish the fascia on El Cangrejal which house the 2 bedroom apartment over the Jungle Room studio.
This will allow the installation of the gutters on both buildings.
Work is progressing on the finishing of the 2 car parking pad over the bodega. This will allow work to proceed on the Jungle Room as it is now being used as a storage area for tools , wood etc.
This wall protects the buildings from the river floods and area above provides for a beautiful landscaped terrace in front of the building's patios.